Search 
   

Reference projects


Our customer in Vienna supplies control  systems for energy automation. 
All control panels  are single panels, designed with the electrical CAD software ELCAD. ELCAD creates the wire and component lists for the subsequent layout and routing with Panel. With our Varianto software, the layout and the routing of the wiring are calculated. Afterwards, the wires in the wiring list (including all production data) are strategically grouped into bundles using our Bundle Calculator software and are sent to our production facility using our Transfer software. Once we have received the data (this only takes a few seconds), the client receives confirmation of a successful order.  
 
The actual production of the wires is started as soon as possible after the order is received, and the customer receives the wiring 24–48 hours after placing the order.

The mark of CadCabel excellence ...


(Workshop Service. Press photo: Siemens). Click to enlarge.
November 29, 2007: A TS IS team member from the service area during maintenance work (function check) on a Desiro in the door area at a UK depot
(Workshop Service. Press photo: Siemens)

In this project, CadCabel supplied our bundle technology to Siemens in order to build 130 Desiro commuter trains with, in total, 1400 control cabinets

  • Over 3.1 million connections total
  • Very complex switchboard layouts with pivoting frames and several levels of cable
  • Very high packing density in each control cabinet
  • High numbers of variants and revisions
  • Each train included 11 control cabinets and about 24,000 cable connections
  • Wiring data from ELCAD, materials list from SAP


The Siemens Desiro-type commuter train (UK). Click to enlarge.

January 8, well-lit, comfortable and fast: the Siemens Desiro-type commuter train (UK). 
(Taken from: Journalist news brochure, January 2008 (press photo: Siemens)


New power plant building, Grevenbroich Germany. Click to enlarge.

New power plant
Grevenbroich, Germany (2 towers, 1300 MW each)

  • Approximately 2 x 700 routed middle- and low-voltage control panels delivered
  • Wiring data and component list from eplan.

New power plant building, Grevenbroich Germany



Gas-insulated substation in Frankfurt, Germany
  • 3x approx. 10,000 m2 production area
  • Medium-voltage control panels supplied
  • Also done by CadCabel: System integration, complete mechanical assembly based on data from CadCabel (bending, edging, laser work, nibbling, stamping, powder coating)
  • Wiring data from ELCAD, Ruplan, eplan 5xx
  • Component lists from SAP


 Gas-Insulated Medium Voltage Installation


Even Paradise needs Control Cabinets …

A large number of building service control cabinets were routed by our engineers and system technicians and then delivered by CadCabel.

Highlights:

  • Engineering data came from Pakistan and India
  • Wiring lists and parts lists from ELCAD

Newsflash

Better bundled

Eplan Software & Service at SPS IPC Drives Hall 7A, Stand 240Up to 60 percent of time can be... more

CadCabel at the SPS/IPC/DRIVES 2012

CadCabel welcomes you at the SPS in Nuremberg, Hall 7A / Booth 307.Meet suppliers of electric... more

WINDPOWER Conference & Exhibition 2012 
June 03.-06. 2012

"MADE IN GERMANY" WINDPOWER Conference & Exhibition 2012 June 03.-06. 2012 at the Georgia... more

CadCabel at the SPS/IPC/DRIVES 2011

22 – 24 Nov. 2011 in Nuremberg CadCabel welcomes you at the SPS in Nuremberg, Hall 7A / Booth... more

CadCabel at WINDPOWER 2011 - Conference + Exhibition in Anaheim/CA, USA. 22nd - 25th of May 2011

WINDPOWER 2011 22nd May - 25th May 2011, Anaheim/CA  Visit us at Hall A/Booth 4637More... more


Akzeptieren

Diese Website verwendet Cookies. Durch die Nutzung dieser Webseite erklären Sie sich damit einverstanden, dass Cookies gesetzt werden. Mehr erfahren