Search 
   

Systems Integration (Options)

Modern company E-CAD systems are integrated into internal IT structures, requiring the following:

  • ERP should be integrated into the component database of CadCabel's panel software program as a master for equipment management.
  • The existing E-CAD system must be supplied with equipment data from the ERP system.
  • The contents of both databases - panel and the E-CAD system - should be kept up-to-date and identical at all times.
  • When component information is stored digitally for the first time in the ERP system and is governed by a database maintenance agreement, information on control cabinet components should be passed on to the CadCabel data management staff.
  • Layouts created with the panel software must, if necessary, be passed on as mechanical production data to the corresponding automatic drilling, milling and nibbling facilities.
  • It is preferable, but not necessary, that a mobile 3D testing and measuring station be linked via WLAN with the ERP system.

CadCabel has the solutions you're looking for. Talk to our Sales Area (Tel. +49 (0) 36081 666-302)

  • Our sales engineers are happy to answer any questions.
  • Our IT staff has the technical expertise to help with this process.

Newsflash

13.01.2012

WINDPOWER Conference & Exhibition 2012 
June 03.-06. 2012

„MADE IN GERMANY“WINDPOWER Conference & Exhibition 2012 
June 03.-06. 2012 at the Georgia... more

16.11.2011

CadCabel at the SPS/IPC/DRIVES 2011

22 – 24 Nov. 2011 in Nuremberg CadCabel welcomes you at the SPS in Nuremberg, Hall 7A / Booth... more

11.05.2011

CadCabel at WINDPOWER 2011 - Conference + Exhibition in Anaheim/CA, USA. 22nd - 25th of May 2011

WINDPOWER 2011 22nd May - 25th May 2011, Anaheim/CA  Visit us at Hall A/Booth 4637More... more

04.11.2010

CadCabel at the SPS/IPC/DRIVES 2010

SPS/IPC/DRIVES 2010 23th November - 25th November 2010Nürnberg SPS/IPC/DRIVES is Europe’s... more

17.06.2009

CadCabel at the SPS/IPC/DRIVES 2009

SPS/IPC/DRIVES 2009 24th November - 26th November 2009 Nürnberg SPS/IPC/DRIVES: SPS/IPC/DRIVES... more